首页> 外国专利> MOBILE SCAFFOLD DEVICE FOR INSPECTION IN TUNNEL CONSTRUCTION WORK

MOBILE SCAFFOLD DEVICE FOR INSPECTION IN TUNNEL CONSTRUCTION WORK

机译:隧道施工工程中的移动脚手架装置

摘要

PROBLEM TO BE SOLVED: To obtain an inspection mobile scaffold device which can easily move an inspecting scaffold in a tunnel during construction by utilizing an existing track rail for a transport carriage without largely changing the external shape of the inspecting scaffold provided with the conventional portal frame, in tunnel construction work by the shield method or the like. ;SOLUTION: A portal frame 4, constituting an inspecting scaffold A formed so as to be arranged on a base beam astriding a power vehicle and transport carriage 3 made to run for in/out carrying materials, machine parts, etc., for construction work to a tunnel on a track rail laid on the base beam 1 set up to a lower part in the tunnel, is provided, and a beam member 11 of horizontal attitude, lifted along a strut 6 by a lift means 13 and having a wheel 12 mounted on the track rail 2, is provided in the front/rear struts 6 in the frame 4, the beam member 11 is positioned in a lowering down end part, the wheel 12 is forcedly mounted on the track rail 2, a lower surface of the portal frame 4 is floated from an upper surface of the base beam 1, and this condition is held, so that the inspecting scaffold A can be moved on the track rail 2.;COPYRIGHT: (C)2001,JPO
机译:要解决的问题:为了获得一种检查用移动式脚手架装置,该装置可以利用现有的运输车轨道来在施工过程中轻松地在隧道中移动检查用脚手架,而无需大幅度改变常规门架所具有的检查用脚手架的外形。在通过屏蔽法等进行的隧道施工中。 ;解决方案:门架4,构成检查脚手架A,该检查脚手架A形成为布置在横梁上,该横梁横穿动力车辆和运输车3,运输车3运用于进出建筑材料的运输材料,机器零件等。在设置于设置在隧道下部的基础横梁1上的轨道上,在隧道上设置有横梁,并且该横梁构件11通过支撑装置6沿着支柱6被抬起并且具有车轮12,该横梁构件11为水平姿势。在框架4的前/后支柱6上设置有安装在轨道2上的梁,梁构件11位于下端的下端部,车轮12被强制地安装在轨道2上,其下表面被安装在轨道2上。门架4从基础梁1的上表面浮起,并保持此状态,以便使检查脚手架A可以在滑轨2上移动。版权所有:(C)2001,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号