首页> 外国专利> WAGE INTEGRATING AND ESTIMATING SYSTEM/WAGE INTEGRATING AND ESTIMATING METHOD FOR BUILDING/INTERIOR DECORATION CONSTRUCTION, COMPUTER PROGRAM THEREFOR AND RECORDING MEDIUM

WAGE INTEGRATING AND ESTIMATING SYSTEM/WAGE INTEGRATING AND ESTIMATING METHOD FOR BUILDING/INTERIOR DECORATION CONSTRUCTION, COMPUTER PROGRAM THEREFOR AND RECORDING MEDIUM

机译:建筑/室内装饰施工的工资综合估算系统/工资综合估算方法,计算机程序参考及记录介质

摘要

PROBLEM TO BE SOLVED: To provide a wage integrating and estimating system/wage integrating and estimating method of building/interior decoration constructions permitting an inexpensive construction with the absolute minimum labor cost and the absolute minimum construction period not only for a body construction and fixture/interior decoration constructions, etc., but also the construction of a large building, and the computer program and a recording medium.;SOLUTION: The system is provided with an each part calculation means A calculating the labor cost of the building/interior decoration constructions for each part such as the entrance, bathroom, toilet, living room, kitchen and window frame of the building, a required time calculation means B setting time required for the constructions of the respective parts and calculating the wage estimated amount of a minute unit and an automatic calculation means housing calculation data by the each part calculation means A and the required time calculation means B in an integrated format, setting the fixed number of forming persons and unit time corresponding to the data input of the parts and execution quantities of the building/interior decoration constructions and calculating output data such as total work time, man-hours, a percentage, a unit price for each part, a work wage and a wage per tsubo by using an automatic calculation master 3.;COPYRIGHT: (C)2003,JPO
机译:要解决的问题:提供一种建筑/室内装饰结构的工资综合估算系统/工资综合估算方法,该方法不仅可以使车身结构和固定装置/室内装饰结构等,也包括大型建筑物的结构,计算机程序和记录介质。;解决方案:该系统设有各个部分计算装置A,用于计算建筑物/室内装饰结构的人工成本对于建筑物的入口,浴室,卫生间,起居室,厨房和窗框等每个部分,所需时间计算装置B设定各个部分的构造所需的时间,并计算每分钟单位的工资估算值;以及自动计算装置容纳各部分计算装置A的计算数据和所需时间计算装置B以综合格式,设置固定数量的成型人员和单位时间,对应于建筑物/室内装饰结构的零件数据输入和执行量,并计算输出数据,例如总工作时间,工时,百分比,每个零件的单价,工作工资和使用自动计算主机3的每坪工资。;版权所有:(C)2003,JPO

著录项

  • 公开/公告号JP2002334234A

    专利类型

  • 公开/公告日2002-11-22

    原文格式PDF

  • 申请/专利权人 SHINSHOWA CORP;

    申请/专利号JP20010139232

  • 发明设计人 MATSUDA YOSHIHIKO;

    申请日2001-05-09

  • 分类号G06F17/60;G06F17/50;

  • 国家 JP

  • 入库时间 2022-08-22 00:14:56

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号