首页> 外国专利> MATERIAL PROCUREMENT AND CONSTRUCTION PLAN INTEGRATED PROJECT MANAGEMENT SYSTEM

MATERIAL PROCUREMENT AND CONSTRUCTION PLAN INTEGRATED PROJECT MANAGEMENT SYSTEM

机译:物料采购和施工计划集成项目管理系统

摘要

PROBLEM TO BE SOLVED: To provide a system capable of unitarily managing information on ordering, transportation and on-site management of materials in step with a project.;SOLUTION: The system automatically lists materials required for each unit work process (work package) at the bottom of the work hierarchy in a project management program using attributes unique to the materials created on a 3-dimensional model (kind, quality, weight, measurement, transportation method, installation area/floor, etc.), and utilizes them for a material procurement plan, carrying-in of the materials to a work site, and management of the materials on site. When there occurs a change or an addition of design, listing of materials is automatically carried out by execution of correction on the model, of which records are unitarily managed. The system reduces human work and enables accurate listing and ordering of materials to be made in a short time.;COPYRIGHT: (C)2004,JPO&NCIPI
机译:解决的问题:提供一个系统,能够与项目同步地统一管理有关物料的订购,运输和现场管理的信息。解决方案:该系统会在以下位置自动列出每个单元工作流程(工作包)所需的物料项目管理程序中工作层次结构的最底层,使用在3维模型上创建的材料所独有的属性(种类,质量,重量,尺寸,运输方法,安装区域/地板等),并将它们用于材料采购计划,将材料运到工作现场以及现场材料的管理。当发生更改或增加设计时,通过对模型执行校正来自动进行材料清单,并统一管理记录。该系统减少了人工工作,可以在短时间内准确地列出和订购材料。;版权所有:(C)2004,JPO&NCIPI

著录项

  • 公开/公告号JP2004234338A

    专利类型

  • 公开/公告日2004-08-19

    原文格式PDF

  • 申请/专利权人 HITACHI LTD;

    申请/专利号JP20030022221

  • 发明设计人 SHIMIZU AKIHIRO;KATAGIRI SHIYUUSHIN;

    申请日2003-01-30

  • 分类号G06F17/60;

  • 国家 JP

  • 入库时间 2022-08-21 23:34:42

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号