首页> 外国专利> Process for control of the torrent and moment of Catherine of a probe of intervention of pit

Process for control of the torrent and moment of Catherine of a probe of intervention of pit

机译:坑探的凯瑟琳洪流和力矩控制方法

摘要

"The process to control the speed and time of Catherine of a probe of speech well.The technology shown here provides a system that calculates the position of a Catherine, the speed of Catherine and the weight borne by Catherine (38).The system takes all these parameters into account when decelerates and / or stop the Catarina (38), and when it reaches a position out of the crowning (104) or off the floor (106).The result is a much safer operation of Catherine (38) in a probe of intervention (20), as well as a probe of oil drilling.
机译:“很好地控制语音探针的凯瑟琳速度和时间的过程。此处显示的技术提供了一个计算凯瑟琳位置,凯瑟琳速度和凯瑟琳所承受重量的系统(38)。当减速和/或停止卡塔琳娜(38)以及到达拱顶(104)或离开地板(106)的位置时,系统会考虑所有这些参数。结果是凯瑟琳的操作更加安全(38)进行干预(20),以及进行石油钻探。

著录项

  • 公开/公告号BR0316659A

    专利类型

  • 公开/公告日2005-10-18

    原文格式PDF

  • 申请/专利权人 KEY ENERGY SERVICES INC.;

    申请/专利号BR20030316659

  • 发明设计人 FREDERIC M. NEWMAN;

    申请日2003-11-24

  • 分类号B66D1/48;B66C13/50;E21B19/00;E21B19/02;

  • 国家 BR

  • 入库时间 2022-08-21 22:18:31

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号