首页> 外国专利> METHOD construction of an underground tunnel TANK in the formation of rock salt LIMITED POWER

METHOD construction of an underground tunnel TANK in the formation of rock salt LIMITED POWER

机译:岩盐形成中地下隧道TANK的施工方法LIMITED POWER

摘要

1.method u0441u043eu043eu0440u0443u0436u0435u043du0438u00a0 underground tunnel reservoir in reservoir rock salt limited power for drilling vertical and designed u0441u043au0432u0430u0436u0438 n an aimed wells in a horizontal position near the bottom of the well casing u0441u043eu043bu00a0u043du043eu0433u043e, installation and technology of pipes with u0440u0430u0441u043fu043eu043bu043e statement shoes have soles u0441u043eu043bu00a0u043du043eu0433u043e technology of pipe formationu0441u0431u043eu0439u043au0443 wells on u0441u043eu043bu00a0u043du043eu043cu0443 u043fu043bu0430u0441u0442u0443, dissolving of the water through the technological pipe column aimed wells with the selection of brine on technology column of vertical wells, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, shoe technology column pipes installed at the exit of the designed borehole wells in burn u0437u043eu043du0442u0430u043bu044cu043du043eu0435 situationat the initial stage of u0440u0430u0441u0442u0432u043eu0440u0435u043du0438u00a0 species between the toes up, guys casing and technological columns pipes designed wells pose a project preparatory by the height of the underground tunnel reservoir in the casing column tube wells have u043du0435u0440u0430u0441u0442u0432u043eu0440u0438u0442u0435u043bu044c maintaining u0443u0440u043eu0432u043du00a0 boundary section u043du0435u0440u0430u0441u0442u0432u043eu0440u0438u0442u0435u043bu044c pickle juice in the upper part of the design.and in the u0441u0442u0443u043fu0435u043du0447u0430u0442u043eu043c u0440u0430u0441u0442u0432u043eu0440u0435u043du0438u0438 species in each step of the tunnel roof u0444u043eu0440u043cu0438u0440u043eu0432u0430u043du0438u00a0 reservoir in vertical well section not border solvent - pickle support at the level of or above the boundary section u043du0435u0440u0430u0441u0442u0432u043eu0440u0438u0442u0435u043bu044c - brine in the preparatory design.;2. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that a u043du0435u0440u0430u0441u0442u0432u043eu0440u0438u0442u0435u043bu00a0 use natural gas.
机译:1.方法 u0441 u043e u043e u0440 u0443 u0436 u0435 u043d u0438 u00a0地下盐岩储层中的竖井钻探功率有限,并设计了 u0441 u043a u0432 u0430 u0436 u0438 n在井筒底部附近的水平位置对准目标井 u0441 u043e u043b u00a0 u043d u043e u0433 u043e,具有 u0440 u0430 u0441 u043f u043e u043b u043e陈述式鞋具有鞋底 u0441 u043e u043b u00a0 u043d u043e u0433 u0433 u043e管形成技术 u0441 u0431 u043e u043e u0439 u043a u0443在 u0441 u043e u043b u043b上的孔u043e u043c u0443 u043f u043b u0430 u0441 u0442 u0443将水通过工艺管柱目标井溶解,并选择垂直井工艺柱上的盐水, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0,已安装在烧伤 u0437 u043e u043d u0442 u0430 u043b u0440 u0430 u0441 u0441 u0442 u0432 u043e u0440 u0435 u043d u043d u0438 u00a0初始阶段的情况,人员套管和设计的技术柱管构成井根据套管柱管井中地下隧道水库的高度进行的项目准备工作 u043d u0435 u0440 u0430 u0441 u0442 u0432 u043e u0440 u0438 u0442 u0435 u043b u044c维护 u0443 u0440 u043e u0432 u043d u00a0边界部分 u043d u0435 u0440 u0430 u0441 u0442 u0432 u043e u0440 u0438 u0442 u0435 u043b u044c腌制汁位于设计的上部。 u0441 u0442 u0443 u043f u0435 u043d u0447 u0430 u04430 u0442 u043e u043c u0440 u0430 u0441 u0441 u0442 u0432 u043e u0440 u0435 u0435 u043d u0438 u0438种垂直井段中的井顶 u0444 u043e u0440 u043c u0438 u0440 u043e u0432 u0430 u043d u0438 u00a0储层没有边界溶剂-在边界段 u043d或以上的水平处的咸菜支撑u0435 u0440 u0430 u0441 u0442 u0432 u043e u0440 u0438 u0442 u0435 u043b u044c-筹备设计中的盐水; 2。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,因此 u043d u0435 u0440 u0430 u0441 u0441 u0442 u0432 u043e u0440 u0438 u0442 u0435 u043b u00a0使用天然气。

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号