Construction procedure for flood protection system, involves combining sidewalls with special foundation and upper platform of sidewalk or cycle track to form circular outer protection casing mounted in stationary manner along flood limit
Construction procedure for flood protection system, involves combining sidewalls with special foundation and upper platform of sidewalk or cycle track to form circular outer protection casing mounted in stationary manner along flood limit
The procedure involves combining sidewalls (12) with a special foundation (2) and the upper platform (3) of a sidewalk or a cycle track to form a circular outer protection casing (1). The outer protection casing is mounted in a stationary manner along the flood limit (4). The folded up sidewalls are deposited in the cavity space (5) between the special foundation and the platform. An independent claim is also included for a flood protection system.