首页> 外国专利> DOUBLE-PIPE AND DOUBLE-PACKER CONSTRUCTION METHOD

DOUBLE-PIPE AND DOUBLE-PACKER CONSTRUCTION METHOD

机译:双管道和双包装构造方法

摘要

PROBLEM TO BE SOLVED: To practice a double-pipe and double-packer method without a delay of a construction period.;SOLUTION: A plurality of injection holes 1a are provided on a peripheral wall, and an inner rod, which is fitted with an excavating bit transferring a striking force and a rotational force, applied from a single-pipe excavator, to a ring bit 1b, is inserted into a casing 1, the leading end of which is fitted with the ring bit 1b, so that a hole can be bored in natural ground G. After the inner rod and the excavating bit are pulled out from the casing 1, a sleeve pipe 3, wherein an ejection hole 3a is formed, is inserted into the casing 1, and a sealing material 6 is infilled into a gap between the casing 1 and the sleeve pipe 3. An injection pipe 4, which is equipped with a pair of packers 4b and 4b and a jet hole 4a provided between the packers 4b and 4b, is inserted into the sleeve pipe 3. In the state of the installation of the casing 1 in the natural ground G, grout 5 is injected into the natural ground G from the injection hole 1a via the jet hole 4a and an ejection hole 3a.;COPYRIGHT: (C)2007,JPO&INPIT
机译:解决的问题:在不延迟施工周期的情况下实施双管双封隔器方法;解决方案:在周壁上设置多个注入孔1a,并在内部杆上安装一个将从单管挖掘机施加的冲击力和旋转力传递到环形钻头1b的挖掘钻头插入到壳体1中,该壳体的前端装有环形钻头1b,从而能够形成孔。在将内杆和挖掘钻头从壳体1中拉出之后,将形成有喷射孔3a的套管3插入壳体1中,并填充密封材料6。注入管4插入到套管3中,该注入管4配备有一对封隔器4b和4b以及设置在封隔器4b和4b之间的喷射孔4a。在将壳体1安装在自然地面G中的状态下,灌浆5通过喷射孔4a和喷射孔3a从注入孔1a注入自然地面G 。;版权所有:(C)2007,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号