首页> 外国专利> PILE FOUNDATION CONSTRUCTION SYSTEM FITTING THE PILE IN AN EXCAVATED HOLE AND A METHOD THEREOF

PILE FOUNDATION CONSTRUCTION SYSTEM FITTING THE PILE IN AN EXCAVATED HOLE AND A METHOD THEREOF

机译:适合于开挖孔中的桩基础施工系统及其方法

摘要

PURPOSE: A pile foundation construction system and a method thereof are provided to reduce time and period for construction by preventing the intensity degrade of the pile.;CONSTITUTION: An excavated hole is formed on a ground or bedrock using a blow frame with a measuring line. Translation distance of the measuring line is detected by a measuring unit located in and a position separated from the blow frame(S130). Depth of the excavated hole in which the blow frame forms is measured using movement time and translation distance of the measuring line(S140). A pile gets closer to the excavated hole after ground and bedrock blowing is stooped, if the depth of the excavated hole reaches a pre-set value.;COPYRIGHT KIPO 2010
机译:目的:提供一种桩基础施工系统及其方法,通过防止桩的强度降低来减少施工时间和周期。组成:使用带有测量线的打击架在地面或基岩上开挖孔。测量线的平移距离由位于吹塑框架中并与吹塑框架分开的位置的测量单元检测(S130)。使用移动时间和测量线的平移距离来测量形成有吹塑框架的挖掘孔的深度(S140)。如果开挖孔的深度达到预设值,则在打桩并基岩吹气弯曲后,桩会更靠近开挖孔。COPYRIGHTKIPO 2010

著录项

  • 公开/公告号KR20090109217A

    专利类型

  • 公开/公告日2009-10-20

    原文格式PDF

  • 申请/专利权人 YOON JAE KEUN;

    申请/专利号KR20080034552

  • 发明设计人 YOON JAE KEUN;

    申请日2008-04-15

  • 分类号E02D7/02;E02D7/00;

  • 国家 KR

  • 入库时间 2022-08-21 19:12:26

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号