首页> 外文会议>International Multi-Conference on Industrial Engineering and Modern Technologies >New Method For The Construction Of Pile Foundations In Low-Rise Constructions Using Micro-Piles In The Knocked-Out Wells
【24h】

New Method For The Construction Of Pile Foundations In Low-Rise Constructions Using Micro-Piles In The Knocked-Out Wells

机译:淘汰井中微桩在低层建筑桩基础建设的新方法

获取原文

摘要

The high cost of ribbon foundations,reinforced concrete piles and metal piles,the complexity of such work requires the introduction of a promising method of pile foundations,which are particularly suitable for areas with complex hydrogeological conditions,one of which is the Voronezh Region.A new method for the construction of pile foundations is presented,consisting in the device of micropiles in the knocked-out wells directly on the construction site by using the nozzle on the excavator.The nozzle is a metal pipe with a replaceable steel tip with a diameter of 0.12 to 0.87 m and a length of 0.8 to 3.5 m.Piles are monolithic(made on a construction site).The study of this technology allowed to find out that the use of the nozzle in the device of micropiles reduces the material consumption of works and increases productivity,greatly simplifying the process of construction of pile foundations.
机译:钢筋基础的高成本,钢筋混凝土桩和金属桩,这些工作的复杂性需要引入桩基的有希望的方法,这特别适用于具有复杂的水文地理条件的区域,其中一个是Voronezh Region.a提出了桩基施工的新方法,通过在挖掘机上使用喷嘴直接在施工现场直接在建筑工地上的微量井装置中。喷嘴是具有直径的可更换钢尖的金属管0.12至0.87米,长度为0.8至3.5 m.piles是单片(在建筑工地上制作)。允许这项技术的研究发现,使用喷嘴在微型装置的装置中可以降低材料消耗作品并提高生产力,大大简化了桩基建造过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号