The utility model aims to create a standard design station complex deep foundation pylon-column type, which provides reducing the time of design and construction, while reducing the cost of operations. Said technical result is achieved in that the station set underground includes average hall side station tunnels with alternating between a proemnymi and wall portions landing platform to access roads, escalator tunnels trailer down substations block technological premises plenum tunnel ventilation bypass cable collector. Middle room is designed as a set of tubings diameter of 9.5 meters with a tray made of reinforced concrete with internal metalloizolyatsiey, side station tunnels made in the lining of the tubing diameter, 8.5 meter circular shape, side wall sections station tunnels formed as pylons 6,008 meters wide , proemnye portions are openings between pylons width 3,755 meters, the distance between the access roads is 22.0 meters, and the passenger boarding platform performed 162.0 meter lengths. 2 ill.
展开▼