首页>
外国专利>
METHOD TO BUILD EARTH WATER-RETAINING CONSTRUCTION IN WARM SEASON (VERSIONS)
METHOD TO BUILD EARTH WATER-RETAINING CONSTRUCTION IN WARM SEASON (VERSIONS)
展开▼
机译:建立暖季土保水施工的方法(版本)
展开▼
页面导航
摘要
著录项
相似文献
摘要
FIELD: construction.;SUBSTANCE: method includes laying of a construction body in layers and compaction of rocks in layers, formation of antifiltration and drainage devices. Laying the construction body in layers is done while stepping back from the end part by means of its build-up. According to the first version, layers are laid in an inclined manner from the base to the collar with layer compaction of rocks. According to the second version, layers are laid horizontally from the base to the collar with layer compaction of rocks.;EFFECT: improved quality of earth water-retaining construction and efficiency of its construction method.;13 cl, 12 dwg
展开▼