首页>
外国专利>
METHOD AND DEVICE FOR PRODUCTION bitumen or extra heavy fractions of oil from underground deposits, corresponding to an apparatus and method of this facility
METHOD AND DEVICE FOR PRODUCTION bitumen or extra heavy fractions of oil from underground deposits, corresponding to an apparatus and method of this facility
展开▼
机译:从地下沉积物生产沥青或超重馏分油的方法和设备,对应于该设施的设备和方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
FIELD: oil and gas industry.;SUBSTANCE: according to the method, energy is supplied into the field, at one side, in the form of steam, and at the other side - in the form of electric energy for inductive and/or resistive electric heating. Energy for generation of steam and simultaneously for electric heating is generated in place of production in a decentralised manner. For this purpose a part of the produced bitumen and/or extra heavy fraction of oil is used for operation of an industrial turbine with a connected generator. At the same time, at one side, using the generator connected downstream the turbine, electric power is produced for heating. At the other side, a boiler related to the industrial turbine, serves for steam generation by means of water evaporation. Also there is at least one block of wells provided, to which electric power is supplied, which is generated in the generator, and power in the form of steam at the ratio from 1 to 3 to 1 to 4.;EFFECT: increased efficiency of the method and reliability of a device.;26 cl, 3 dwg
展开▼