首页> 外国专利> UNDERGROUND STRUCTURE CROSSING ACTIVE FAULT ZONE

UNDERGROUND STRUCTURE CROSSING ACTIVE FAULT ZONE

机译:穿越活动断层带的地下结构

摘要

PROBLEM TO BE SOLVED: To provide an underground structure crossing an active fault zone which does not impair a function as a structure against an anticipated slip between sliding surfaces.;SOLUTION: An underground structure T1 crossing an active fault zone includes a structure body 1 formed to cross the underground sliding surface (the active fault zone) F, and an outside tunnel 2 formed to surround the outer periphery of the structure body 1 in a crossing section A including the crossing part of the sliding surface F. The structure body 1 includes a crossing part structure 10 formed in the crossing section A, and a general part structure 11 formed in a general section B adjacent to the crossing section A. The crossing part structure 10 is supported at two points at the front and rear of the sliding surface F in the outside tunnel 2.;COPYRIGHT: (C)2013,JPO&INPIT
机译:要解决的问题:提供一种穿过活动断层带的地下结构,该结构不会损害滑动面之间的预期滑动的功能。解决方案:解决方案:穿过活动断层带的地下结构T1包括结构体1结构体1在与地下滑动面(活动断层带)F交叉的方向上贯通,并在包括滑动面F的交叉部分的交叉部分A中包围结构体1的外周而形成有外部隧道2。结构体1包括交叉部分结构10形成在交叉部分A中,交叉部分结构11形成在与交叉部分A相邻的大体部分B中。交叉部分结构10在滑动表面的前后两点处被支撑。 F在外部隧道2中。;版权所有:(C)2013,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号