首页>
外国专利>
PRELIMINARY ANALYSIS OF DRILLING SITE FOR PLANNING OF DEPOSITE MINING
PRELIMINARY ANALYSIS OF DRILLING SITE FOR PLANNING OF DEPOSITE MINING
展开▼
机译:浅议矿山规划的钻探场地。
展开▼
页面导航
摘要
著录项
相似文献
摘要
FIELD: mining.;SUBSTANCE: method includes stages, at which the following is carried out: data is collected from an exploratory hole, and analysis of data uncertainty is carried out. The exploratory hole is prepared for flow passage by means of at least one recovery action in the exploratory hole shaft. The initial speed of the hydrocarbon flow is identified from the exploratory hole shaft. The selected method of exploratory hole finishing is selected. The second speed of hydrocarbon flow is determined from the well shaft to identify increased amount of production as a result of the recovery action. In response to identification of the increased amount of production as a result of the recovery action, they assess results for the well shaft using a model of one shaft, and results are scaled to the deposit level.;EFFECT: determination of active reservoirs.;20 cl, 9 dwg
展开▼