首页>
外国专利>
Work plan management equipment , work plan management method , and work plan management program
Work plan management equipment , work plan management method , and work plan management program
展开▼
机译:工作计划管理设备,工作计划管理方法和工作计划管理程序
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a work planning and control system which achieves aggregate analysis of occurrence timing and a ratio of walk-in works even if a worker does not judge and manually input attributes of the sporadically occurring works.;SOLUTION: In the work planning and control system, a means for determining walk-in work 314 determines if the registered date and hour Y of a work in worker's charge of the work X to be recorded in a work in a charge information storage 322 and the beginning date and hour Z of a work plan to be recorded in a work plan information storage 323 are within a constant hour h when the worker registers the work plan of the work X by a means for planning and controlling work 312, and sets the attribute of the walk-in work of the work to be recorded in the work information storage 322 as "normal" when the conditions are met.;COPYRIGHT: (C)2010,JPO&INPIT
展开▼