首页> 美国政府科技报告 >Master Program Management Plan. Volume 1: Management Processes, Volume 2: Annual Report and Work Plan. Comprehensive Everglades Restoration Plan.
【24h】

Master Program Management Plan. Volume 1: Management Processes, Volume 2: Annual Report and Work Plan. Comprehensive Everglades Restoration Plan.

机译:硕士课程管理计划。第1卷:管理流程,第2卷:年度报告和工作计划。综合大沼泽地恢复计划。

获取原文

摘要

The purpose of this Master Program Management Plan (Master Plan) is to describe the framework and process to be used by the U.S. Army Corps of Engineers (Corps) and the South Florida Water Management District (SFWMD) for managing and monitoring implementation of the Comprehensive Everglades Restoration Plan (Comprehensive Plan). This document provides the Corps and the SFWMD with a common understanding of the business processes and protocols to be applied during implementation of the Comprehensive Plan. For this Master Plan the term program refers to the Comprehensive Plan projects for which the SFWMD is the local sponsor. The Comprehensive Plan was developed to accomplish a set of system-wide goals and objectives. Due to size and complexity, implementation of the Comprehensive Plan requires that it be divided into smaller implementable packages of components that are referred to as projects. As these projects are further planned and designed, analyses and evaluations that measure each packages overall contribution to system-wide goals will be conducted to determine and, thus, ensure that the system-wide goals and benefits of the Comprehensive Plan are being realized.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号