首页> 外国专利> Precast Concrete Pier Cap Structure In The Bridge And Manufacturing Method Of Pretension Precast Concrete Pier Cap

Precast Concrete Pier Cap Structure In The Bridge And Manufacturing Method Of Pretension Precast Concrete Pier Cap

机译:桥梁中的预制混凝土墩盖结构及预应力预制预制墩的制造方法

摘要

The present invention provides a precast concrete pier cap structure for a bridge comprising a precast pier cap (200) which is pre-manufactured with a hollow (212) at the bottom and a pier cap re-bar inside; and a bridge column (200) with multiple column main re-bars (110) protruding from the top to be inserted into the hollow (212) and a protrusion inserted into the hollow (212) to be hung on the top edge. Also, the present invention provides a manufacturing method for a pretension precast concrete pier cap (200) to which pretension is introduced by a production form (600). The method comprises a production form installation step for installing the production form (600) in a workplace (1); a tension member installation step for installing a pretensioned tension member (2); a re-bar and concrete placement step (3); a curing step for curing and hardening concrete to be placed (4); and a production form detachment step for detaching the production form (600) (5).
机译:本发明提供了一种用于桥梁的预制混凝土墩盖结构,该结构包括预制的墩盖(200),该预制的墩盖(200)在底部具有空腔(212),并且在内部具有墩盖钢筋。桥柱(200)具有从顶部突出以插入到空腔(212)中的多个柱主钢筋(110)和插入到空腔(212)中以悬挂在顶部边缘上的突起。而且,本发明提供一种用于预拉伸预制混凝土墩盖(200)的制造方法,该预拉伸预制混凝土墩盖通过生产模板(600)引入了预拉伸。该方法包括生产表格安装步骤,用于将生产表格(600)安装在工作场所(1)中;以及拉伸构件安装步骤,用于安装预拉伸的拉伸构件(2);钢筋和混凝土的放置步骤(3);用于固化和硬化待放置的混凝土的固化步骤(4);以及用于分离生产形式(600)(5)的生产形式分离步骤。

著录项

  • 公开/公告号KR101388135B1

    专利类型

  • 公开/公告日2014-04-23

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20120093596

  • 发明设计人 손제국;이재훈;손윤기;유동호;

    申请日2012-08-27

  • 分类号E01D19/02;

  • 国家 KR

  • 入库时间 2022-08-21 15:41:03

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号