首页> 美国政府科技报告 >Accelerated Bridge Construction Utilizing Precast Pier Caps On State Highway 69 Over Turkey Creek, Huerfano County, CO
【24h】

Accelerated Bridge Construction Utilizing Precast Pier Caps On State Highway 69 Over Turkey Creek, Huerfano County, CO

机译:加利福尼亚州Huerfano县土耳其河上的69号高速公路上使用预制墩帽的加速桥梁施工

获取原文

摘要

The purpose of this report is to document Accelerated Bridge Construction (ABC) techniques on IBRD (Innovative Bridge Research and Development) project 102470 for the construction of Bridge N-16-Q on State Highway 69 over Turkey Creek. The construction work was done on project FBR 069A-022, PC 15772, and was completed in July of 2011. During the course of the project, participants were able to: (1) develop a design methodology, (2) develop universal details, and (3) demonstrate how fast the bridge could be constructed using this technique. The project demonstrated faster pier erection by utilizing precast pier caps to eliminate concrete cure time from the critical path in the construction schedule.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号