PROBLEM TO BE SOLVED: To formulate a plan for maintenance of an industrial machine for performing specific work.;SOLUTION: A maintenance plan formulation system includes: first measurement means for measuring a value of information that changes in accordance with operation of an industrial machine for specific work; second measurement means for measuring a value of information that changes in accordance with movement of the industrial machine; and a server 110 for formulating a plan for maintenance of the industrial machine. The server 110 includes: a first parameter calculation unit 117 for calculating a parameter indicating the degree of operation of the industrial machine for specific work; a second parameter calculation unit 118 for calculating a parameter indicating the degree of movement of the industrial machine; and a type classification unit 122 for classifying a tendency of use forms of the industrial machine into any of plural predetermined types. Maintenance plan information on the industrial machine is generated in accordance with the classification by the type classification unit 122 and transmitted.;COPYRIGHT: (C)2013,JPO&INPIT
展开▼