首页> 外文OA文献 >Maintenance Activity Planning on Cenrtifugal Pump System With Failure Modes and Effects Analysis (Fmea) Method Based on Fuzzy Cost Estimation and Reliability Centered Maintenance II Method
【2h】

Maintenance Activity Planning on Cenrtifugal Pump System With Failure Modes and Effects Analysis (Fmea) Method Based on Fuzzy Cost Estimation and Reliability Centered Maintenance II Method

机译:基于模糊成本估算和以可靠性为中心的维修II方法的失效模式和影响分析(Fmea)方法的中央泵系统维修活动计划

摘要

Background: Without any system that is able to identify the malfunction, causes,udimpacts and detection method as well as the the cost occurred from quality problem,udsuch maintenance activity plan would fail in deciding which maintenance activity isudaccurate and has the ability to anticipate surrounding problem, product quality, andudultimately, the cost occurred from quality problem. Objective: This research that tookudcase study in PPP company are aimed to (1) decide accurate maintenance activity forudcentrifugal pump components which concern about the causes and effects of suchudfailures, (2) to decide optimum maintenance interval, and (3) to analyze the systemudimprovement after applying the combination of Reliability Centered Maintenance IIudand FMEA Method Based On Fuzzy Cost Estimation methods. Results: The researchudreveals the priority item that its characteristic should become a reference of the wholeudcentrifugal pump maintenance, based on its highest RPI score. The result of thisudresearch shows the maintenance requirement activities to handle failures fromudequipment. Futhermore, the implementation of methods proposed in this research givesudimprovement of down time which decreases to 17 percent and saves the maintenanceudcost by 20.5 percent. Conclusion: In order to have good maintenance system, it shouldudbe designed with the reliability-assurance-oriented approach with failure costudconsideration. The combination of Reliability Centered Maintenance II and FMEAudMethod Based on Fuzzy Cost Estimation methods could fulfill those needs.
机译:背景:没有任何能够识别故障,原因,影响和检测方法的系统,以及由于质量问题而产生的成本,这样的维护活动计划将无法确定哪个维护活动是正确的并且具有能力预测周围的问题,产品质量,以及最终成本是由质量问题引起的。目的:本研究以PPP公司为案例,旨在(1)确定与离心泵部件相关的原因和后果的离心泵组件的准确维护活动,(2)确定最佳维护间隔,以及( 3)应用基于模糊成本估算方法的以可靠性为中心的维修II ud和FMEA相结合的方法对系统改进进行分析。结果:本研究基于其最高RPI分数,优先考虑了其特性应成为整个离心泵维护的参考的优先项目。此 udresearch的结果显示了维护要求活动,以处理来自设备的故障。此外,本研究中提出的方法的实施减少了停机时间,减少了17%,并节省了20.5%的维护成本。结论:为了拥有良好的维护系统,应该采用面向可靠性保证的方法进行设计,同时要考虑故障成本考虑周全。以可靠性为中心的维修II和基于模糊成本估算方法的FMEA udMethod的组合可以满足这些需求。

著录项

  • 作者

    Mudiastuti Retnari Dian;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种 en_US
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号