PROBLEM TO BE SOLVED: To provide a continuous casting method of round cast slab for manufacturing 13Cr seamless steel tube by which the occurrence of shrinkage hole formed in a last stage of solidification, and A-type cracks attributable thereto are sufficiently suppressed on the practical level together with C-type cracks.;SOLUTION: When performing forcible cooling in the last stage of solidification during the continuously casting of a round cast slab for a 13Cr seamless steel tube, as a point at which the core part stress of a strand subjected to continuous casting is converted from the compression side to the tension side, a time point is obtained at which the sign of an integrated value of SR=(dTs/dt)-(dTc/dt) is converted form negative to positive, the integrated value of SR being derived from a drop rates (dTs/dt) and (dTc/dt) per unit time of the strand surface temperature Ts and the core part temperature Tc, and the condition for forcible cooling in the last stage of solidification is controlled so that the temperature of the strand core part at the sign conversion point is below 1,100°C, that is the temperature at which the hot ductility of molten steel is caused.;COPYRIGHT: (C)2013,JPO&INPIT
展开▼
机译:解决的问题:提供一种用于制造13Cr无缝钢管的圆铸板坯的连续铸造方法,该方法在实际水平上充分地抑制了在凝固的最后阶段形成的缩孔的产生以及由此引起的A型裂纹的产生。解决方案:在连续铸造用于13Cr无缝钢管的圆铸坯的凝固过程的最后阶段进行强制冷却时,在该点处,钢绞线的核心部分应力会受到将连续铸造从压缩侧转换为拉伸侧,获得一个时间点,在该时间点,SR =(dT s Sub> / dt)-(dT c < / Sub> / dt)从负转换为正,SR的积分值由下降率(dT s Sub> / dt)和(dT c Sub> / dt )单位时间内的表面温度T s Sub>和芯部温度T c Sub>控制凝固的最后阶段的强制冷却条件,以使符号转换点处的铸坯芯部分温度低于1100°C,即引起钢水热延展的温度。 :(C)2013,JPO&INPIT
展开▼