首页> 外国专利> MARINE CONSTRUCTION METHOD FOR FLOATING BODY-TYPE MARINE STRUCTURE, AND FLOATING BODY-TYPE MARINE STRUCTURE

MARINE CONSTRUCTION METHOD FOR FLOATING BODY-TYPE MARINE STRUCTURE, AND FLOATING BODY-TYPE MARINE STRUCTURE

机译:浮体式海洋结构的海上施工方法及浮体式海洋结构

摘要

PROBLEM TO BE SOLVED: To provide a floating body-type marine structure and a marine construction method thereof that enhance construction efficiency on a sea and curtail a construction period.SOLUTION: A marine construction method for a floating body-type marine structure includes the following steps: a first step in which a floating body structure 1A is made to float on a sea surface and moored, the floating body structure having an insertion hole formed for installing a tower part 1B by inserting the tower part in a vertical direction; a second step in which work for constructing a frame body of the tower part 1B in the insertion hole at a prescribed height, and work for lowering the constructed tower part 1B under a sea surface, are repeated sequentially for constructing the overall tower part 1B, and submerging the tower part 1B under the sea surface except for a top part; a third step following the second step, in which the constructed tower part 1B is lifted utilizing buoyancy, and the lifting work is halted when a connection part of a ring-form hollow part 1C of the tower part 1B floats above the floating body structure 1A, for constructing the ring-form hollow part 1C on the top part of the floating body structure 1A; and a fourth step in which a remaining part of the tower part 1B is lifted after constructing the overall ring-form hollow part 1C, to have the tower part 1B stand independently on the floating body structure 1A.SELECTED DRAWING: Figure 12
机译:解决的问题:提供一种浮体型海事建筑结构及其海事施工方法,其能够提高海上施工效率并缩短工期。解决方案:一种浮体型海事建筑的海洋施工方法包括以下步骤:步骤:在第一步骤中,使浮体结构1A漂浮在海面上并系泊,该浮体结构具有形成用于通过在竖直方向上插入塔架部分1B而安装塔架部分1B的插入孔;在第二步骤中,依次重复用于将塔架部分1B的框架主体以预定高度构造在插入孔中以及将所构造的塔架部分1B降低到海面以下的工作,以构造塔架整体1B,将塔架部分1B浸没在海面的顶部以下。在第二步骤之后的第三步骤中,利用浮力将已建造的塔架部分1B提起,并且当塔架部分1B的环形中空部分1C的连接部分漂浮在浮体结构1A上方时,停止起吊工作,用于在浮体结构1A的顶部上构造环形空心部分1C;第四步是在构造整个环形中空部分1C之后抬起塔架部分1B的其余部分,使塔架部分1B独立地站立在浮体结构1A上。图12

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号