首页> 外国专利> Procedure for the manufacture of a segment of a Concrete prefabricated piece for a Tower of a Wind Energy installation of formwork and a segment of a Tower of a Concrete prefabricated Piece

Procedure for the manufacture of a segment of a Concrete prefabricated piece for a Tower of a Wind Energy installation of formwork and a segment of a Tower of a Concrete prefabricated Piece

机译:用于模板的风能设备的塔的混凝土预制件的片段和混凝土预制件的塔的片段的制造程序

摘要

Provides a procedure for the manufacture of a segment of a Precast Concrete Tower for a Tower of a Wind Power Plant. A formwork is placed Inside (220) with at least one Hole (240) and at least one Clamping Unit (400) in an inner side of the Inner formwork (220) in the area of the Hole (240).It introduces a First End (310) a Concrete anchor (300) and a First End (310) a removable element (410) on the first End (310) of the Concrete anchor (300) from the Outer side of the Inner formwork (220) through the opening (240) in the Clamping Unit (400) To support the Concrete anchor (300). Outer formwork is placed (210).Concrete formwork is introduced between the Inner and Outer formwork (220, 210). Remove the removable element (410) on the first End (310) or the first End (310) of the Concrete anchor (300) and removed the segment of Precast Concrete.
机译:提供了用于制造风力发电厂塔架的预制混凝土塔架的一部分的过程。模板放置在内部(220)中,在内部模板(220)的内侧(孔(240)区域)内具有至少一个孔(240)和至少一个夹紧单元(400)。从内部模板(220)的外侧穿过混凝土锚杆(300)的一端(310),在混凝土锚杆(300)的第一端(310)的第一端(310)上的可移动元件(410)。夹紧单元(400)中的开口(240),以支撑混凝土锚(300)。放置外部模板(210)。在内部和外部模板之间引入混凝土模板(220、210)。移除混凝土锚固件(300)的第一端(310)或第一端(310)上的可移动元件(410),并移除预制混凝土段。

著录项

  • 公开/公告号AR096931A1

    专利类型

  • 公开/公告日2016-02-10

    原文格式PDF

  • 申请/专利权人 WOBBEN PROPERTIES GMBH;

    申请/专利号AR2014P102618

  • 发明设计人 CARLOS PEIXOTO;

    申请日2014-07-16

  • 分类号B28B21/02;E04G11/20;

  • 国家 AR

  • 入库时间 2022-08-21 14:27:40

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com