INTEGRATED PROGRESS MEASUREMENT AND MANAGEMENT METHOD FOR EPC PROJECT

机译:EPC项目综合进度测量与管理方法

摘要

The present invention provides a method for calculating and managing an EPC integrated progress rate. The method for calculating and managing an EPC integrated progress rate includes: a step of setting a baseline schedule based on plans of activities, lists of the activities based on an activity breakdown structure, and a work breakdown structure (WBS) list for design management, purchasing management, and construction/trial operation management of an EPC project; a step of setting up a progress rate and performance management module calculating a progress rate of the activity in accordance with process progress by work package, by grouping the work packages comprising one or more activities formed in a same pattern, to correspond to the baseline schedule; a step of generating an account of each worker when the progress rate and performance management module is set up, and allocating the work package to the each worker; a step in which the worker inputs progress information by an input reading module related to the progress rate and performance management module; a step of calculating and reading the progress rate and a result in the progress rate and performance management module using the input progress information; and a step of reviewing and approving the result by each tool based on the calculated progress rate and the result. The method for calculating and managing an EPC integrated progress rate changes an individual work to a cooperation work system, and from an off-line method to an on-line method. So, the method can automatize calculation of the progress rate and progress result counting by automatizing work mostly using a system.
机译:本发明提供一种用于计算和管理EPC综合进度的方法。用于计算和管理EPC综合进度的方法包括:根据活动计划设置基线计划的步骤,基于活动分解结构的活动列表以及用于设计管理的工作分解结构(WBS)列表, EPC项目的采购管理和施工/试运营管理;设置进度率和绩效管理模块的步骤,通过将包含以相同模式形成的一个或多个活动的工作包进行分组,以根据基准进度表,根据工作包的流程进度来计算活动的进度率;当建立了进度和绩效管理模块时,生成每个工人的帐户的步骤,并将工作包分配给每个工人;步骤,工人通过与进度和绩效管理模块有关的输入阅读模块输入进度信息;使用输入的进度信息在进度和绩效管理模块中计算和读取进度和结果的步骤;以及根据计算出的进度和结果,由每个工具审查和批准结果的步骤。用于计算和管理EPC综合进度的方法将单个工作更改为合作工作系统,并从离线方法更改为在线方法。因此,该方法可以通过主要使用系统使工作自动化来实现进度和进度结果计数的自动化计算。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号