首页> 外国专利> Project progress management method and project progress management apparatus

Project progress management method and project progress management apparatus

机译:项目进度管理方法和项目进度管理装置

摘要

PROBLEM TO BE SOLVED: To calculate accurate residual operation man-hour by deriving a proper reliability growth curve model according to quality of a development result and a degree of attainment of performance in a project.SOLUTION: A project progress management method includes: acquiring information of a target project specified from information of a project stored in a storage unit; specifying a reliability growth curve model candidate group of a development result in the target project on the basis of the information of the target project; estimating a reliability growth curve model of the development result in the target project from the reliability growth curve model candidate group on the basis of an actual value related to the quality of the development result and an actual man-hour; calculating a residual operation man-hour of the target project on the basis of the estimated reliability growth curve model and a target value related to the quality of the development resu and outputting the calculated residual operation man-hour in association with the information of the target project.SELECTED DRAWING: Figure 6
机译:解决的问题:根据开发结果的质量和项目绩效的程度,通过推导适当的可靠性增长曲​​线模型来计算准确的剩余工时。解决方案:项目进度管理方法包括:获取信息根据存储在存储单元中的项目的信息指定的目标项目;根据目标项目的信息,指定目标项目中开发结果的可靠性增长曲​​线模型候选组;根据与开发结果的质量有关的实际值和实际工时,从可靠性增长曲​​线模型候选组中估计目标项目中开发结果的可靠性增长曲​​线模型;根据估计的可靠性增长曲​​线模型和与开发结果的质量有关的目标值,计算目标项目的剩余运营工时;并结合目标项目的信息输出计算出的剩余操作工时。选定的图纸:图6

著录项

  • 公开/公告号JP6382068B2

    专利类型

  • 公开/公告日2018-08-29

    原文格式PDF

  • 申请/专利权人 株式会社日立製作所;

    申请/专利号JP20140219853

  • 发明设计人 桶屋 勝幸;内田 吉宣;

    申请日2014-10-29

  • 分类号G06F8/77;

  • 国家 JP

  • 入库时间 2022-08-21 13:09:20

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号