首页> 外国专利> Method for transportation of the output, particularly during sinking of a mining shaft

Method for transportation of the output, particularly during sinking of a mining shaft

机译:用于运输输出物的方法,特别是在矿井下沉时的方法

摘要

the invention solves the problem of dredging, particularly when excavating mine shaft. transport of the dredging, particularly when the excavating shaft mining, using hydrotransportu system based on hydraulic lewarze with tu0142oczniu0105, podajnikiem consuming urobkiem harvested from tunnelling deep shaft and water under pressure.in tray dredging water mixture is produced, which is embossed by pipeline to the ground surface. in the hydrotransportu stream mixture, dredging (5) with water, is supplied from a shaft (7) by dna hydrotransportu pump (10), to a pressure tank (14), which is at atmospheric pressure (pb).at this time, the second pressure vessel (4), which is then working pressure (pr) is emptied of accumulated dredging (5), and dredging (5) mixed with water under pressure (pr) is embossed tube (8) to a separator (9) on the surface of the ground. during the filling urobkiem (5) of a pressure vessel (4) or a pressure tank (14), dredging is odwadniany.at the time of switching system work pressure vessels (4) and (14) of the "filling" on the "emptying" and vice versa, through the by-pass line (17) passes through the stream of water (qb) for the compression (8) without feeders (3) and (19).during the emptying of dredging (5) pressure vessels (4) or (14), to pressure vessels (4) or (14), is supplied under pressure stream water (qr), which "spulchnia" dredging (5) in the pressure vessels (4) or (14). the urabiaju0105ca (11) moving nadu0105u017cnie for combine (6), ciu0119gnie (18). the object of the application is also the transport of dredging.
机译:本发明解决了挖泥的问题,特别是在挖掘矿井时。挖泥船的运输,特别是在挖掘井筒的开采中,使用基于液压勒沃兹的水力输送系统,带有t u0142oczni u0105,在开挖深井和水的压力下,podajnikiem消耗了urobkiem。通过管道输送到地面。 dna水力输送泵(10)从竖井(7)将疏通水(5)的水输送到水流混合物中,此时压力罐(14)处于大气压(pb)。然后将工作压力(pr)的第二压力容器(4)中的积聚的疏ging物(5)排空,并将在压力(pr)下与水混合的疏ed物(5)压花管(8)到分离器(9)在地面上。在压力容器(4)或压力罐(14)的充填尿路(5)期间,疏通是odwadniany。在系统“工作”的压力容器(4)和(14)切换系统时, “清空”,反之亦然,通过旁通管线(17)通过水流(qb)进行压缩(8),而没有给水器(3)和(19)。 5)在压力流水(qr)下向压力容器(4)或(14)供应压力容器(4)或(14),该压力流水在压力容器(4)中“挖泥”(5)或(14)。 urabiaj u0105ca(11)将nad u0105 u017cnie移至联合收割机(6),ci u0119gnie(18)。应用的目的也是疏the的运输。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号