Sinking the Primsmulde return air shaft at the Ensdorf colliery of DSK by the shaft drilling method

机译:通过轴钻方法将Primsmulde回风轴沉入DSK的Ensdorf煤矿

获取原文
获取原文并翻译 | 示例
       

摘要

In the middle of this decade the Ensdorf colliery will put the Primsmulde field into operation. The return air shaft required for this purpose serves not only to ventilate this field, but also improves the fresh air supply in conjunction with the already deepened North shaft in the existing Dilsburg field. The aim of the planning started in 1996 was to put the shaft into operation with the lowest possible cost, adequate return air capacity and at the earliest possible time. In a project study mechanical sinking of the shaft with a shaft drilling machine was preferred to other sinking methods for time and cost reasons. In the three construction phases of the shaft not only were new standards set in the directional, development and shaft drilling with a depth of 1,260 m, but innovative techniques not previously applied in mechanical shaft-sinking were used.
机译:在这十年的中期,恩斯多夫煤矿将把Primsmulde油田投入运营。为此目的所需的回风竖井不仅可以使该区域通风,还可以与现有的迪尔斯堡油田中已加深的北竖井一起改善新鲜空气的供应。该计划始于1996年,其目的是使轴以尽可能低的成本,充足的回风量并在尽可能短的时间内投入运行。在一项项目研究中,由于时间和成本原因,与其他下沉方法相比,使用井下钻孔机对轴进行机械下沉更为可取。在竖井的三个建设阶段中,不仅为定向,开发和竖井钻进设定了新标准,深度达1,260 m,而且还采用了以前在机械竖井中未应用的创新技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号