首页> 外文期刊>矿业科学技术学报:英文版 >Principles of the roof cut short-arm beam mining method (110 method) and its mining-induced stress distribution
【24h】

Principles of the roof cut short-arm beam mining method (110 method) and its mining-induced stress distribution

机译:顶切短臂梁开采法(110法)的原理及其开采引起的应力分布

获取原文
获取原文并翻译 | 示例
       

摘要

Since the 1960 s, mining science and technology in China has experienced two technical innovations, i.e.the ‘‘Masonry Beam Theory(MBT)" and ‘‘Transfer Rock Beam Theory(TRBT)". Based on those theories, the conventional mining method(being called the 121 mining method) was established, consisting of excavating two tunnels with a pillar left for mining a working panel. However, with increasing mining depth,engineering geological disasters in the underground caverns have been frequently encountered. In addition, the use of the coal-pillar mining results in a large amount of coal resources unexploited. In order to address the problems above, the ‘‘Roof Cut Short-Arm Beam Theory(RCSBT), being called the 110 mining method)" was proposed by He Manchao in 2008. The 110 mining method features the mining of one coal seam panel, excavating necessarily only one roadway tunnel and leaving no pillars. Realization of the 110 mining method includes the following steps:(1) directional pre-splitting roof cutting,(2) supporting the roof by using high Constant Resistance Large Deformation bolt/cable(CRLD), and(3) blocking gangue by hydraulic props. This paper presents an overview of the principles, techniques and application of the 110 mining method. Special emphasis is placed on the numerical simulation of the geostress distribution found in the mining panel using the 110 method compared to that of the 121 method. In addition, the stress distribution on the ‘‘short beam" left by the roof cutting when performing the 110 method was also investigated using both numerical simulation and theoretical formulation.

著录项

  • 来源
    《矿业科学技术学报:英文版》 |2018年第003期|P.391-396|共6页
  • 作者单位

    [1]State Key Laboratory for Geomechanics and Deep Underground Engineering, Beijing 100083, China;

    [2]Center of Rock Mechanics and Geoharzards, Shaoxing University, Shaoxing 312009, China;

    [3]School of Mechanics and Civil Engineering, China University of Mining and Technology, Beijing 100083, China;

    [1]State Key Laboratory for Geomechanics and Deep Underground Engineering, Beijing 100083, China;

    [3]School of Mechanics and Civil Engineering, China University of Mining and Technology, Beijing 100083, China;

    [1]State Key Laboratory for Geomechanics and Deep Underground Engineering, Beijing 100083, China;

    [3]School of Mechanics and Civil Engineering, China University of Mining and Technology, Beijing 100083, China;

    [4]Geological Exploration and Research Institute of LNYS, Shenyang 110000, China;

    [1]State Key Laboratory for Geomechanics and Deep Underground Engineering, Beijing 100083, China;

    [3]School of Mechanics and Civil Engineering, China University of Mining and Technology, Beijing 100083, China;

  • 收录信息 中国科学引文数据库(CSCD);
  • 原文格式 PDF
  • 正文语种 CHI
  • 中图分类 贵重金属矿开采;
  • 关键词

    采矿方法; 房顶; 分发; 横梁; 手臂; 压力; 技术革新; 数字模拟;

    机译:采矿方法;房顶;分发;横梁;手臂;压力;技术革新;数字模拟;
  • 入库时间 2022-08-19 04:26:47
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号