The present invention establishes an operation plan for controlling aberration and hydrological operation in order of drainage, generation standby, power generation and drainage standby in each tidal cycle, and obtains the maximum generation amount per annotation cycle based on the tidal data which is changed every tidal cycle This is a method for predicting the optimal operation of a tributary type tidal power generation system that can obtain the operating conditions for the maximum power generation while minimizing the number of times of generating power generation in establishing the operation plan and establishing the operation plan. In this paper, we propose a method to select the optimal solution for the development of the water column at the time of power generation. And an accurate interval selection method.
展开▼