首页> 外国专利> 2 CFT System constructing the tunnel by Concrete-Filled TubeCFT manufacturing in the factory and fabricating it in the site and method constructing the tunnel thereof

2 CFT System constructing the tunnel by Concrete-Filled TubeCFT manufacturing in the factory and fabricating it in the site and method constructing the tunnel thereof

机译:2 CFT系统,其在工厂中通过混凝土填充CubeCFT制造来构造隧道并在现场进行制造,以及构造其隧道的方法

摘要

The present invention minimizes the time required for assembling and fixing upper and lower half-section concrete-filled tube (CFT) steel pipe girders (100AC) (200BC) by being dualized into a factory production method where the quality of upper and lower half-section CFT steel pipe girders (100AC) (200BC) is uniform and a field assembly method where field fixing is rapid, such that rapid response and support for the ground displacement of initial instability due to rapid blasting are not only ensured by structural safety, and due to a horizontal length expansion structure of a ceiling crown, the arched upper half-section CFT steel pipe girder is moved to the ground. Accordingly, the present invention enables tunnel construction to be efficient and economical.
机译:本发明通过双重化为上下半质量的工厂生产方法,使组装和固定上下半截面混凝土填充钢管(CFT)钢管梁(100AC)(200BC)所需的时间最小化。截面CFT钢管梁(100AC)(200BC)均匀且现场安装方法快速现场固定,这样不仅可以通过结构安全性确保对快速爆破引起的初始不稳定性的地面位移的快速响应和支持,并且由于天花板的水平长度扩展结构,拱形的上半截面CFT钢管梁被移至地面。因此,本发明能够使隧道建设高效且经济。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号