首页> 外国专利> CFT 2 2 2 Double order system adjusting horizontal length of steel pipe supporter in the tunnel and the structure of the pipe supporter and method constructing thereof

CFT 2 2 2 Double order system adjusting horizontal length of steel pipe supporter in the tunnel and the structure of the pipe supporter and method constructing thereof

机译:CFT 2 2 2调节隧道内钢管支架水平长度的双阶系统及其结构和方法构造

摘要

The present invention relates to a dual-walled installation system for a steel girder by means of a length-adjustable steel pipe supporting member and a CFT steel pipe supporting member reinforced by the filling and stiffness. The horizontal extending member (S) of the ceiling crown (C) The horizontal length of the arch-shaped upper half-section steel pipe support is expanded and adjusted by the length adjusting pipe (P) so that the interval between the tunnel base where the over-bore is generated and the arch-like upper half- As the main purpose is to extend and adjust the horizontal length, the arched upper semi-section steel pipe support is horizontally moved toward the tunnel ground, so that the excavation interval of the ground and the upper half steel tube support of arches is minimized and the shotcrete transfer It is a useful invention that minimizes the cost and makes the tunnel construction possible.
机译:本发明涉及一种钢梁的双壁安装系统,其通过长度可调节的钢管支撑构件和通过填充和刚度增强的CFT钢管支撑构件。顶冠(C)的水平延伸部件(S)通过长度调节管(P)扩展和调节拱形上半部钢管支撑的水平长度,从而使隧道底部之间的间隔由于主要目的是延伸和调节水平长度,拱形的上半截面钢管支座水平向着隧道地面移动,因此开挖间隔为减少了拱的地面和钢管的上半部支撑,并进行了喷射混凝土的输送。这是一项有用的发明,可将成本降至最低并使隧道施工成为可能。

著录项

  • 公开/公告号KR101899441B1

    专利类型

  • 公开/公告日2018-09-17

    原文格式PDF

  • 申请/专利号KR20160105120

  • 发明设计人 마상준;

    申请日2016-08-18

  • 分类号E21D11/14;E21D11/10;E21D11/18;E21D11/22;

  • 国家 KR

  • 入库时间 2022-08-21 12:37:07