首页> 外国专利> Face and industrial endoscope device before method of geology tunnel work

Face and industrial endoscope device before method of geology tunnel work

机译:地质隧道施工方法前的工作面及工业内窥镜装置

摘要

PROBLEM TO BE SOLVED: To survey even a natural ground of which pore wall is prone to collapse, directly acquire a situation of the natural ground, and perform survey by simple work.SOLUTION: The geological survey method in front of a tunnel working face, includes: in a process where a natural ground in front of a working face S is drilled by a drill jumbo 2 that includes a drifter 2a moving forward/backward freely, on a guide cell 2b, and a drilling machine mounted thereon for performing drilling by a rod 3 having a drilling bit 4 at a tip end, when the drill jumbo reaches a geological survey site, temporarily stopping the drilling; retreating the rod 3 along with the drifter 2a by a prescribed distance to separate the drifter 2a from the rod 3; sending an endoscope insertion section 6 of an industrial endoscope apparatus 1 from a base end side of the rod 3 through a drilling water feed passage 3a; causing a distal end to project from a drilling water discharge hole 5 of the drilling bit 4 to the outside; and surveying a situation of the natural ground in front of the drilling bit 4 by the endoscope insertion section 6.SELECTED DRAWING: Figure 2
机译:解决的问题:甚至要测量孔壁容易塌陷的自然地面,直接获取自然地面的状况,并通过简单的工作进行测量。解决方案:隧道工作面前的地质勘测方法,包括:在工作面S前面的自然地面上,通过一个包括在导向室2b上自由地向前/向后移动的漂移器2a的钻探巨型钻2以及安装在其上的钻孔机,通过当钻头到达地质勘测点时,杆3的顶端具有钻头4,杆3暂时停止钻探。使杆3与漂移器2a一起后退预定距离,以使漂移器2a与杆3分离。从杆3的基端侧通过钻探水进给通道3a传送工业内窥镜设备1的内窥镜插入部分6。使顶端从钻头4的钻孔排水孔5向外突出。并通过内窥镜插入部分6测量钻头4前面的自然地面情况。选图:图2

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号