首页> 外国专利> Crown Seawall for Wave Overtopping Reduction and Construction Method of the Same

Crown Seawall for Wave Overtopping Reduction and Construction Method of the Same

机译:减少波浪越覆的皇冠海堤及其建造方法

摘要

Provided is an upper structure of a wave overtopping reduction type seawall including: a caisson mounted at an upper part of a seawall; a half-wave part having a first curved surface and a half-wave surface; and a wave dissipation part for first dissipating waves before waves are bumped against the half-wave surface, thereby minimizing wave overtopping through a wave pressure dispersion effect by causing first wave dissipation by the wave dissipation part before waves are bumped against the half-wave surface. Moreover, a construction method of an upper structure of a wave overtopping reduction type seawall includes: a PC (Pre-Cast) part mounting step; a grout pouring step of fixing the PC part at an upper portion of the caisson; an inner concrete pouring step of forming a half-wave part; and a wave dissipation pile joint pouring step of fixing a wave dissipation pile at an upper end of a perforated wall. The construction method of an upper structure of a wave overtopping reduction type seawall can minimize a problem in securing a field work place and minimize a marine operation period of time.
机译:本发明提供了一种波浪越界减小型海堤的上部结构,包括:安装在海堤上部的沉箱;以及安装在海堤上部的沉箱。具有第一曲面和半波表面的半波部分;另外,通过在波碰到半波面之前使波首先消散的波消散部,通过在波碰到半波面之前使波消散部产生第一波消散,从而通过波压分散效果而使波的重叠最小化。 。另外,一种防波顶减少型海堤的上部结构的施工方法包括:PC(预浇铸)部件安装步骤;以及灌浆步骤,将PC部件固定在沉箱的上部;形成半波部分的内部混凝土浇筑步骤;消波桩联合浇注步骤,将消波桩固定在穿孔壁的上端。减少波浪越界型海堤的上部结构的构造方法可以使确保野外作业场所的问题最小化,并且可以使海上作业时间最小化。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号