首页> 外国专利> Construction process of structures with empty segments and construction system of structures with empty segments

Construction process of structures with empty segments and construction system of structures with empty segments

机译:空段结构施工工艺及空段结构施工系统

摘要

An industrialized construction process is provided in which the filling material (8) is poured in situ on empty segments (3) prefabricated ex situ.;The process comprises the prefabrication of empty segments (3) including the assembling of steel reinforcement elements (9) and assembling fixing elements (4) whereby these comprise rigid elements (22) and at least part of the moulds (13), which occur at a location (5) ex situ; transport and placement of the empty segments (3) in the final position in the structure (1); pouring the filling material (8); consolidation or curing of the filling material; prestressing the structure (1); and removal of the moulds (13) and fixing elements (4).;The present invention also relates to a construction system adapted for carrying out the construction process.
机译:提供了一种工业化的建筑工艺,其中将填充材料( 8 )原位浇注在预制的空段( 3 )上。该过程包括预制空洞段( 3 ),包括钢加固元件( 9 )的组装和固定元件( 4 )的组装,其中这些组成部分包括刚性元件( 22 )和至少部分霉菌( 13 ),这些霉菌发生在异位( 5 );空段( 3 )的运输和放置在结构( 1 )的最终位置;倒入填充材料( 8 );填充材料的固结或固化;预应力结构( 1 );以及模具( 13 )和固定元件( 4 )的拆卸。本发明还涉及一种适于进行施工过程的施工系统。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号