首页> 外文OA文献 >Drum-buffer-rope and workload control in High-variety flow and job shops with bottlenecks: An assessment by simulation
【2h】

Drum-buffer-rope and workload control in High-variety flow and job shops with bottlenecks: An assessment by simulation

机译:具有瓶颈的高品种流量和作业车间的鼓缓冲绳和工作负荷控制:通过模拟评估

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Two key concepts in the production planning and control literature that incorporate an order release function are the Theory of Constraints, with its drum-buffer-rope release method, and Workload Control, with its load-based release methods. When order release is applied, jobs are not directly released to the shop floor – release is controlled to realize certain performance measures. The performance impacts of drum-buffer-rope and Workload Control order release have been assessed separately, but the two approaches have not been directly compared in one study. This is a major shortcoming that leaves practitioners without guidance on which release method to select. This study assesses the performance of drum-buffer-rope and Workload Control release in a pure job shop and a general flow shop with varying levels of bottleneck severity. Both bottleneck oriented and non-bottleneck oriented Workload Control release methods are included. Simulation results show that Workload Control release methods lead to better performance than drum-buffer-rope if bottleneck severity is low. But Workload Control, including its bottleneck oriented release methods, is outperformed by drum-buffer-rope if a strong (or severe) bottleneck exists. Workload Control gains an advantage in balanced shops due to its unique load balancing function, which attempts to evenly distribute workloads across resources. But this becomes functionless when there is a strong bottleneck. Our sensitivity analysis suggests that the performance differences between release methods are not affected by routing characteristics or the proportion of jobs that visit the bottleneck.
机译:生产规划和控制文献中的两个关键概念包含订单释放功能的是约束理论,其鼓缓冲绳索释放方法和工作负载控制,其基于负载的释放方法。当应用订单释放时,作业不会直接发布到车间 - 释放被控制以实现某些性能措施。鼓缓冲绳和工作负载控制订单释放的性能影响已被分别进行评估,但在一项研究中,这两种方法尚未直接比较。这是一个主要的缺点,留下从业者没有关于选择的释放方法的指导。本研究评估了纯粹的作业商店中的鼓 - 缓冲绳和工作负载控制释放的性能和具有不同水平的瓶颈严重程度的一般流量商店。包括导向的瓶颈和非瓶颈面向工作负载控制释放方法。仿真结果表明,如果瓶颈严重程度低,工作负载控制释放方法会导致比鼓缓冲绳更好的性能。但是,如果存在强烈的(或严重)瓶颈,则工作负载控制包括其瓶颈导向释放方法,而是通过鼓缓冲绳表现出。由于其独特的负载平衡功能,工作负载控制在平衡商店中获得了优势,这试图跨越资源的工作负载。但是当存在强有力的瓶颈时,这变得无效。我们的敏感性分析表明,释放方法之间的性能差异不受路由特征的影响或访问瓶颈的工作比例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号