首页> 外文OA文献 >Integration of nominal group technique, Shainin system and DMAIC methods to reduce defective products: A case study of tire manufacturing industry in Indonesia
【2h】

Integration of nominal group technique, Shainin system and DMAIC methods to reduce defective products: A case study of tire manufacturing industry in Indonesia

机译:名义集团技术的整合,陕西州系统和DMAIC方法减少缺陷产品:印度尼西亚轮胎制造业的案例研究

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The sales of the automotive was increased by 3.6% in 2018, sparking the automotive and its spare parts industry for more opportunities. Various strategies have been made to win the competition and increase sales, to expand market share and to reduce production costs. Tire industry as automotive parts industry in Indonesia has faced with tremendous competition and the industry needs an appropriate strategy to reduce production costs by reducing defective products. The building process is workstation of the tire industry with the focus on decline on the defective products. Internal data shows the defective products in the building process of 0.20% in 2017 and 0.17% in July ~ September 2018 which were higher than the company's schedule of 0.12% of total production. The NGT, Shainin system and DMAIC (Six sigma) methods are expected to improve defective products of building process. Based on Pareto diagrams it is clear that there were six defective products causing high defective products. However, with the limited research, BLP defective products with the highest defective product (48%) was used as a pilot project in this study. The preliminary results indicate that the proposed method of this paper could succeed in improving the baseline performance of the building process (sigma level) from 4.48 to 5.02 sigma and could reduce the cost from IDR.1.427.500.00 to IDR. 161.000.000 or 88.69%.
机译:2018年汽车的销售额增长了3.6%,引发了汽车及其备件行业的更多机会。已经进行了各种策略来赢得竞争并增加销售,以扩大市场份额并降低生产成本。印度尼西亚汽车零部件行业的轮胎行业面临着巨大的竞争,行业需要采用适当的策略来降低缺陷产品来降低生产成本。建筑工程是轮胎行业的工作站,重点是缺陷产品的下降。内部数据显示2017年建筑过程中的有缺陷产品,2017年7月〜2018年7月〜90%的产品均高于公司总产量的0.12%的时间表。预计NGT,Shainin System和DMAIC(六西格玛)方法将改善建筑工程的缺陷产品。基于帕累托图,很明显有六种缺陷的产品,导致高缺陷的产品。然而,通过有限的研究,具有最高缺陷产品(48%)的BLP缺陷产品被用作本研究中的试点项目。初步结果表明,本文所提出的方法可以成功地提高建筑过程(SIGMA水平)的基线绩效从4.48到5.02西格玛,可以将IDR.1.427.500.00降至IDR的成本。 161.000.000或88.69%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号