首页> 美国政府科技报告 >Jawa-Sumatera Power System Interconnection Feasibility Study. Final Report. Book Two.
【24h】

Jawa-Sumatera Power System Interconnection Feasibility Study. Final Report. Book Two.

机译:Jawa-sumatera电力系统互连可行性研究。总结报告。第二册。

获取原文

摘要

This report, conducted by Fichtner Engineering, Inc., was funded by the U.S. Trade and Development Agency. The report covers the results of a feasibility study conducted to investigate the electrical energy program development for Jawa in Indonesia. The objeactive of the study was to review and analyze previous studies, update information applicable to exisiting conditions, present four scenarios incorporating load forecast, generation and transmission planning, primary energy resource, environmental aspects, regional and social changes and econommic and financial feasibility analysis. The report is divided into four volumes. This volume is Book Two and is divided into the following sections: (5) Transmission System; (6) Primary Energy Resources; (7) Environmental Aspects.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号