首页> 美国政府科技报告 >Estimated Construction Period Impact of Widening U.S. 59 in Houston, Texas
【24h】

Estimated Construction Period Impact of Widening U.S. 59 in Houston, Texas

机译:估计施工期对美国德克萨斯州休斯敦59号扩建的影响

获取原文

摘要

The upgrading and widening of highways over the state, especially in urban areas,are causing the directly affected businesses and property owners to inquire about the possible negative economic impacts of such construction. This paper document the during-construction effects of widening a 3.5 km (2.2 mi) section of U.S. 59, in Houston, Texas, from a 6-lane freeway with a 4-lane service road to a 10-lane freeway and a 6-lane service road. Construction had not been completed when this report was written. Collected data includes information on abutting businesses' estimation of the construction impact on their businesses and property values, and on the traffic volumes, travel times, and accident rates of the highway.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号