首页> 美国政府科技报告 >Mixed Waste Processing System for Asbestos Decontamination Phase 2: Bench-Scale Tests
【24h】

Mixed Waste Processing System for Asbestos Decontamination Phase 2: Bench-Scale Tests

机译:石棉净化混合废物处理系统第2阶段:实验室规模测试

获取原文

摘要

The document describes the Westinghouse Science & Technology Center (WSTC) Phase 2 results for the program entitled 'Mixed Waste Processing System for Asbestos Decontamination: Phase 2 Bench-Scale Integration Testing'. This project will be referred to as the Asbestos Decontamination Project. This Final Topical Report is organized into the following sections: Section 2 provides a brief technical summary of the Asbestos Decontamination Project. Section 3 outlines the overall Phase 2 objectives and tasks performed. It also provides perspective on the different types of experimentation performed in the Phase 2 program and how the data relate to the overall process development effort. Section 4 summarizes the Phase 2 results and conclusions. Section 5 details the ACM washing tests performed on two samples of contaminated ACM materials. Section 6 describes the solution treatment testing performed, ion exchange solution treatment tests, chemical regeneration tests and electrochemical regeneration tests. Section 7 discusses the development of a commercial process design.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号