首页> 美国政府科技报告 >Wastewater Treatment Feasibility Study. Specifications for Project Implementation. Final Report.
【24h】

Wastewater Treatment Feasibility Study. Specifications for Project Implementation. Final Report.

机译:废水处理可行性研究。项目实施规范。总结报告。

获取原文

摘要

The study assesses the existing infrastructure and treatment needs for the waste water treatment plant at the El Palito Refinery, built between 1958 through 1960. This is Volume III, Specifications for Project Implementation and it is made up of the following sub-volumes: (1) Design of Alternatives 1 and 2; (2) Design of New Outfalls with Diffusers for New Discharges; (3) Design for Cyanide Removal; (4) Design for Fluoride Removal.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号