首页> 美国政府科技报告 >Feasibility Study for the Modernization of TP1 and TP2 Baneasa Heating Plants, Bucharest, Romania
【24h】

Feasibility Study for the Modernization of TP1 and TP2 Baneasa Heating Plants, Bucharest, Romania

机译:罗马尼亚布加勒斯特Tp1和Tp2 Baneasa供热厂现代化的可行性研究

获取原文

摘要

This EcoLinks project is a Best Practice because it successfully demonstrated a solution for reducing greenhouse gas emissions and generating reliable and cost effective energy by replacing old heat-only boiler plants with small-scale, combined heat and power plants (CHPs) in a large, district heating utility in Romania. Based on the research and analysis of several alternatives, a practical locally feasible solution resulting in both economic and environmental benefits was selected. This integrative methodology, involving a feasibility study a sound financial strategy, is transferable to other similar utilities seeking to improve energy efficiency and availability and service quality$ and to reduce heat and power costs and greenhouse gas emissions. Moreover, data gathered from surveying residential clients' attitudes toward heat savings and related investments in their apartments and collective buildings provided an important information base that could also benefit other utility companies seeking to improve the quality and reliability of their services.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号