首页> 美国政府科技报告 >Phosphorus Control Action Plan and Total Maximum Daily (Annual Phosphorus) Load Report: Highland Lake, Cumberland and Oxford Counties, Maine. Highland Lake PCAP-TMDL Report, Maine DEPLW 2004-0658.
【24h】

Phosphorus Control Action Plan and Total Maximum Daily (Annual Phosphorus) Load Report: Highland Lake, Cumberland and Oxford Counties, Maine. Highland Lake PCAP-TMDL Report, Maine DEPLW 2004-0658.

机译:磷控制行动计划和每日总磷(年磷)负荷报告:缅因州的高地湖,坎伯兰郡和牛津郡。高地湖pCap-TmDL报告,缅因州DEpLW 2004-0658。

获取原文

摘要

The objectives of this project were twofold: first, a comprehensive land use inventory was undertaken to assist Maine DEP in developing a Phosphorus Control Action Plan (PCAP) and a Total Maximum Daily Load (TMDL) report for the Highland Lake watershed. Simply stated, a TMDL is the total amount of phosphorus that a lake can receive without harming water quality. Maine DEP, with the assistance of the MACD Project Team, will address and incorporate public comments before final submission to the US EPA. Secondly, watershed survey work, including a shoreline survey, was conducted by the Maine DEP-MACD-LEA project team to help assess total phosphorus reduction techniques that would be beneficial for the Highland Lake watershed. Watershed survey work included assessing many direct drainage nonpoint source (NPS) pollution sites that were not identified during the Highland Lake Watershed Project (1998-2000). This project involved identifying NPS pollution sites though computer modeling and field surveys during storm events. BMPs were then designed and implemented to help mitigate phosphorus and sediment loading to Highland Lake on the identified priority sites. The watershed project report also includes model phosphorus ordinances, recommendations for continued monitoring, and phosphorus load reduction calculations.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号