首页> 美国政府科技报告 >Stone Matrix Asphalt Specification and Implementation Final rept. (27 Sep 04-8 Sep 06)
【24h】

Stone Matrix Asphalt Specification and Implementation Final rept. (27 Sep 04-8 Sep 06)

机译:石基质沥青规范与实施最终报告。 (06年9月4日至8月8日)

获取原文

摘要

This report documents activities performed as part of Pennsylvania Department of Transportation (PeenDOT) Project 040109: Stone Matrix Asphalt Specification and Implementation. The project consisted of two primary tasks: to assist the Department in evaluating and refining its SMA Specification, and to develop and deliver a series of training courses on SMA mix design and construction. Six training courses on SMA were delivered in various locations throughout the Commonwealth in April 2006. The courses were in general successful, receiving very favorable evaluations for most aspects of course content and instruction. Some changes were made in the course outline and materials to improve the pace of the course and make it more interesting. This report includes all deliverables discussed in the project documents: this Final Report, the revised training materials, deliverables from Phase 1 of the project and the current Draft SMA Specification.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号