首页> 美国政府科技报告 >Record of Decision for the Electrical Interconnection of the Willow Creek Wind Project
【24h】

Record of Decision for the Electrical Interconnection of the Willow Creek Wind Project

机译:柳溪风电项目电气互连决策记录

获取原文

摘要

The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 72 megawatts (MW) of power to be generated by the proposed Willow Creek Wind Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Willow Creek Energy LLC (WCE) proposes to construct and operate the proposed Wind Project in Gilliam and Morrow counties, Oregon, and has requested interconnection to the FCRTS at a point along BPA's existing Tower Road-Alkali 115-kilovolt (kV) transmission line in Gilliam County, Oregon. BPA will construct a tap to allow the Wind Project to interconnect to BPA's transmission line, and will install new equipment at BPA's existing Boardman Substation in Morrow County, Oregon to accommodate this additional power in the FCRTS. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号