Cost growth is a prevalent problem in Navy shipbuilding programs, particularly for the first ships in new classes. In response to a mandate in the conference report accompanying the Defense Appropriations Act for Fiscal Year 2008, GAO undertook this review to (1) identify key practices employed by leading commercial ship buyers and shipbuilders that ensure satisfactory cost, schedule, and ship performance; (2) determine the extent to which Navy shipbuilding programs employ these practices; and (3) evaluate how commercial and Navy business environments incentivize the use of best practices. To address these objectives, GAO visited leading commercial ship buyers and shipbuilders, reviewed its prior Navy work, and convened a panel of shipbuilding experts. Delivering ships on time and within budget are imperatives in commercial shipbuilding. To ensure design and construction of a ship can be executed as planned, commercial shipbuilders and buyers do not move forward until critical knowledge is attained. Before a contract is signed, a full understanding of the effort needed to design and construct the ship is reached, enabling the shipbuilder to sign a contract that fixes the price, delivery date, and ship performance parameters. To minimize risk, buyers and shipbuilders reuse previous designs to the extent possible and attain an in-depth understanding of new technologies included in the ship design. Before construction begins, shipbuilders complete key design phases that correspond with the completion of a three-dimensional product model. Final information on the systems that will be installed on the ship is needed to allow design work to proceed. During construction, buyers maintain a presence in the shipyard and at key suppliers to ensure the ship meets quality expectations and is delivered on schedule. Navy programs often do not employ these best practices. Ambitious requirements are set and substantial investments made in technology development, but often the Navy does not afford sufficient time to fully mature technology. New designs often make little use of prior ship designs. As a result, a full understanding of the effort needed to execute a program is rarely achieved at the time a design and construction contract is negotiated. This in turn leads the Navy and its shipbuilders to rely on cost-reimbursable contracts (rather than fixed-price contracts) that largely leave the Navy responsible for cost growth.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号