Oregon Demonstration Project: Alternate Project Delivery and Accelerated Bridge Construction on OR 38, Drain to Elkton.

机译:俄勒冈州示范项目:OR 38的替代项目交付和加速桥梁建设,排放到Elkton。

获取原文

摘要

OR 38 is a mountainous two-lane route with large elevation changes that passes across Oregon's coastal range. Oregon's HfL project consisted of removing and replacing five bridges on an 11mi stretch of OR 38 between the towns of Drain and Elkton. All five bridges (Figure 1) were built in the late 1920s and early 1930s and were approaching the end of their useful life. Although all of the bridges identified for replacement had challenging site conditions, two (crossings 3 and 4) stood out for their exceptionally difficult topographic and environmental conditions. Crossings 3 and 4, located at mileposts (MP) 39.64 and 39.97, respectively, are situated at each end of the Elk Creek Tunnel in Elk Creek Tunnel State Park.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号