首页> 美国政府科技报告 >Development of a TL-3 Deep Beam Tubular Backup Bridge Rail, Executive Summary Report
【24h】

Development of a TL-3 Deep Beam Tubular Backup Bridge Rail, Executive Summary Report

机译:开发TL-3深梁管式备用桥梁,执行摘要报告

获取原文

摘要

The objective of this study is to investigate the performance of the ODOT Deep Beam bridge guardrail system per the NCHRP Report 350 TL-3 criteria and identify needed design changes. The final expected product is a design of the ODOT Deep Beam Bridge railing system with any needed retrofit that will bring the system into compliance with the NCHRP Report 350 performance criteria per TL-3. This design should utilize existing rail components with simple retrofit and minimal construction effort.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号