首页> 美国政府科技报告 >Comprehensive Risk Analysis for Structure Type Selection
【24h】

Comprehensive Risk Analysis for Structure Type Selection

机译:结构选型的综合风险分析

获取原文

摘要

Optimization of bridge selection and design traditionally has been sought in terms of the finished structure. This study presents a more comprehensive risk-based analysis that includes user costs and accidents during the construction phase. Costs for bridge projects include actual comprehensive costs, both to the funding agency, the Colorado Department of Transportation (CDOT), and to the public at large, including assessments associated with accidents and user delay times during the construction phase. Bridges were selected to represent a cross section of structure types, ADT (average daily traffic volumes), bridge overall length and CDOT region. A total of 43 bridges were targeted for study, and data were able to be compiled on 20 of these. A questionnaire was developed and sent to CDOT bridge personnel, in order to collect general project information as well as detailed information on construction duration, construction traffic control plans (including detour types and mileposts, time of day scheduling and speed reductions), observed congestion and accidents during construction.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号