首页> 美国政府科技报告 >Evaluation of the Cleveland HealthLine Mechanical Guide Wheel
【24h】

Evaluation of the Cleveland HealthLine Mechanical Guide Wheel

机译:克利夫兰HealthLine机械导向轮的评估

获取原文

摘要

Vehicles on the Cleveland HealthLine Bus Rapid Transit (BRT) system are equipped with a mechanical docking arm and guide wheel to assist with precision docking at the stations. This report documents the evaluation of the guide wheel in 4 areas: how close to the platform the vehicles were able to dock; how fast the vehicles were able to dock; how much money was spent on damages related to docking; and how well the guide wheels are regarded by the HealthLine drivers. The evaluation compared the performance of the HealthLine to the EmX BRT in Eugene, Oregon. The EmX uses the same model vehicle as the HealthLine but does not come equipped with a docking arm and guide wheel.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号