首页> 美国政府科技报告 >Project Mohole Scientific and Technical Progress for the Period Ending October 15, 1964, Drilling Platform Crane Requirements
【24h】

Project Mohole Scientific and Technical Progress for the Period Ending October 15, 1964, Drilling Platform Crane Requirements

机译:1964年10月15日结束时期mohole科学技术进步项目,钻井平台起重机要求

获取原文

摘要

Contents: Analysis of load requirements; Crane Locations; Operating radii and boom lengths required; Type of crane most suitable (general materials and supply handling, positioning unit handling, heavy lift requirements, personnel handling); Operating environmental factors (platform reaction to heavy crane loads and gantry crane travel, dynamic and shock loading); Crane design requirements (lifting capacities, function requirements, main and auxiliary hoist drum cable capacities, boom and rigging, crane support gantry design and travel features, type of power, safety features).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号